It took me about 3 weeks in total to get all of these done, next i'll start with the IC chips removal. These were all cut with either a slip and roll cutter where I could cut 6 at a time and was averaging 5 minutes per KG or individually with a PCB slicer and got it down to 6.5 minutes per KG.
Am doing these in batches of 500g in AP but might increase it to 1KG. Have made a RAM finger holder to help circulate the solution and when lifted out foild to fall back into the solution. What are peoples experiences with running larger batches of fingers?
Am doing these in batches of 500g in AP but might increase it to 1KG. Have made a RAM finger holder to help circulate the solution and when lifted out foild to fall back into the solution. What are peoples experiences with running larger batches of fingers?