Claudie said:You sure do nice work!
Palladium said:Claudie said:You sure do nice work!
Thanks Claudie. I've always been a person who loves to build things with my hands. Even though my cost has been low up until now i figure i have about 100 single man hours in the project and i couldn't tell you how many more in just the design. I've built it all on the fly and so far i feel good about it. I'm going to do some interesting things with the fume hood design yet and the design of the hoods are such that you can use one for processing and one for melting. Or you can use the melting hood for processing should you have the need which would double my capacity. Both can run independent of each other or together when it comes to air volume. Note they are both identical in design except for the melting hood which will serve dual purposes and incorporate a work station which will make it possible to pour ingots, incinerate, or pour shot all while working at the same station without the need for troublesome movement or awkwardness.
Palladium said:I almost forgot to list the cost of missing a nail with a 16oz eastwing hammer. No guts, No glory. lol
Enter your email address to join: