themandrakehat
Member
edit: added some photos
Hi all,
Second baby means it's time to let go of all my equipment and my huge pile of scrap. (that's if I want to stay married a little longer...)
- 2x fume cabinets (basic 1200mm and a 1500mm one that was pulled from Auckland University that come with extraction fan -- heavy but very reliable!)
- About 200kgs of Telecom grade board (the Nokia etc. boards that go in telecom exchanges)
- About 100+kgs of Server motherboards (mostly HP DL360,380 etc.)
- About 150kgs of regular PC and laptop motherboards (mix of green and colored boards)
- Large pile of Hard drive boards, RAM boards, CPUs etc.
If anyone in NZ is interested (I'm in Tauranga, BOP) I can get detailed pictures and actual weights, at the moment everything is boxed up and fills up 1/2 a double garage and a full shed.
Cheers!
Greg
Hi all,
Second baby means it's time to let go of all my equipment and my huge pile of scrap. (that's if I want to stay married a little longer...)
- 2x fume cabinets (basic 1200mm and a 1500mm one that was pulled from Auckland University that come with extraction fan -- heavy but very reliable!)
- About 200kgs of Telecom grade board (the Nokia etc. boards that go in telecom exchanges)
- About 100+kgs of Server motherboards (mostly HP DL360,380 etc.)
- About 150kgs of regular PC and laptop motherboards (mix of green and colored boards)
- Large pile of Hard drive boards, RAM boards, CPUs etc.
If anyone in NZ is interested (I'm in Tauranga, BOP) I can get detailed pictures and actual weights, at the moment everything is boxed up and fills up 1/2 a double garage and a full shed.
Cheers!
Greg