I am new forum member, but have been reading / lurking for a long time. I want to thank everyone here as I finally felt I was ready processed (~490g) of well trimmed fingers via AP. I credit Hoke and the these forums for a successful first run, knowing what I was doing and knowing when I should step back and be sure of what I am going to do next. In the end everything went as it should and I am hooked.
My first run resulted in 2.7g (pic attached) of what I think is good looking powder (to be accumulated before re-refine and melting in a bigger batch.)
As soon as I refine my bucket/bubbles setup. My next batch(s) will be ~20lbs out new naked RAM PCB cards that have never had chips installed. I need to decide if I should separate the fingers from the PCBs and run them as two separate groups or just leave the cards whole. My gut says whole is fine, my anxiety says separate them so no gold from the fingers has the opportunity to cement inside the board if something gets out of balance in the solution. Either way, second batch should get started this weekend. Woot!
Thanks!
I am new forum member, but have been reading / lurking for a long time. I want to thank everyone here as I finally felt I was ready processed (~490g) of well trimmed fingers via AP. I credit Hoke and the these forums for a successful first run, knowing what I was doing and knowing when I should step back and be sure of what I am going to do next. In the end everything went as it should and I am hooked.
My first run resulted in 2.7g (pic attached) of what I think is good looking powder (to be accumulated before re-refine and melting in a bigger batch.)
As soon as I refine my bucket/bubbles setup. My next batch(s) will be ~20lbs out new naked RAM PCB cards that have never had chips installed. I need to decide if I should separate the fingers from the PCBs and run them as two separate groups or just leave the cards whole. My gut says whole is fine, my anxiety says separate them so no gold from the fingers has the opportunity to cement inside the board if something gets out of balance in the solution. Either way, second batch should get started this weekend. Woot!
Thanks!